Home > Aarrow Fires > Stove > Aarrow Fires Arrow Ecoburn operating and Installation Manual

Aarrow Fires Arrow Ecoburn operating and Installation Manual

Here you can view all the pages of manual Aarrow Fires Arrow Ecoburn operating and Installation Manual. The Aarrow Fires manuals for Stove are available online for free. You can easily download all the documents as PDF.

Page 11

Aarrow Ecoburn Stoves 
11 
INSTALLATION
 
 
Due to the gradual introduction of Europe Chimney 
Standards chimneys will be specified according to 
their performance designation as defined in BS EN 
1443 that covers the General Requirements for 
chimneys. The minimum performance designation 
required for use with solid fuel burning stoves is 
T450 N2 S D3. 
 
The flue and chimney installation must be carefully 
checked by a competent person before fitting the 
stove to ensure it is suitable and will work...

Page 12

Aarrow Ecoburn Stoves 
12  INSTALLATION
 
NOTE -  Under no circumstances should this  
appliance be connected to a shared flue system, that 
serves any other heating appliance.  TYPICAL REAR FLUE OUTLET (as per BS 8303-1)
 
Maximum 150mm 
(6”) Horizontal
 
Flue Section  Minimum 150mm 
(6”) Diameter Flue  
Soot Door 
Fire Retardant  
Rope Packing  
Maximum 100mm (4”)  
Brick Up Aperture 
Fill Void  

Page 13

INSTALLATION
 
Aarrow Ecoburn Stoves  13  PLAN VIEW OF REGISTER PLATE AND  
CLEARANCES FOR NON INSULATED FLUES 
 
(Plan View Of Steel Register Plate, 1.5mm
 Thick  
Minimum )  Non  
Combustible 
Register 
Plate. 
Minimum 
1.5mm Thick 
Steel. 
TYPICAL TOP FLUE OUTLET (as per BS 8303-1)  
Typical Metal Insulated Chimney System 
Installed To The Chimney Manufactures  
Instructions In Compliance With Building Regulations 
And BS 7566 Part 1 to 4  

Page 14

 
ADJUSTING THE SELF 
 LEVELLING FEET 
 
The Aarrow Ecoburn stoves are equipped with  
adjustable rear levelling feet, these are ideal for 
use where the hearth surface is not flat or level. 
 
Adjustment is as follows : 
 
 
Position the stove on the hearth into its final 
resting place, ensuring room for the flue 
connections etc.  
 
  On the rear leg of the stove, loosen the pozi 
screw, and rotate the inner „cam‟ shaped 
levelling foot until this touches the hearth. 
(see fig. 2.)  
 
...

Page 15

15
 
Aarrow Ecoburn Stoves  INSTALLATION
 
 
   
FINAL CHECK LIST 
 
Before handing over the installation to the  
customer it is a requirement under Document J 
that the appliance is lit and the functioning of the 
chimney system is checked for satisfactory       
operation. 
 
 
Be sure that the chimney is operating 
and ALL smoke and fumes are vented to 
the atmosphere through the chimney  
    terminal.  
 
  Check all joints and seals. 
 
  Clean the outside of the appliance to 
    prevent any...

Page 16

BUILDING CONTROL CONSENT CHECKLIST 
Hearths, Fireplaces, Flues and chimneys 
This checklist is to ensure heaths, fireplaces, flues and chimneys are satisfactory, and show what you have done to comply wi th  the requirements of the Building Regulations 2000 approved Document J 2002 
   1. Building address where work has been carried out ……………………………………………………………………………....
 
  
………………………………………………………………………………………………………………………….  
  
2. Identification of hearth, fireplace chimney or flue 
  
3. Firing...

Page 17

ANNUAL MAINTENANCE 
 
It is important that your appliance is regularly  
serviced in accordance with these instructions. 
This should be carried out at least annually by a 
qualified person and should consist of the  
following : 
 
CLEANING 
 
Important; 
Under some circumstances soot can 
quickly build up on the throat plate and adjacent 
areas. The throat plate should be removed and 
checked monthly, and any debris stripped off. 
Similarly, clean the upper surface of the firebox. 
 
Remove the...

Page 18

Aarrow Ecoburn Stoves 
18  SERVICE & MAINTENANCE
 
 
SUMMER STORAGE / NON  
USAGE 
 
Please ensure that your stove is left clean and 
moving components are well lubricated for the 
summer months (during periods of prolonged non 
use). If possible store the throat plate outside of 
the stove, check all moveable components, at 
regular intervals, to ensure they are moving freely. 
 
Allow air movement through the stove, by opening 
the air wash and primary air inlet (s) controls to 
about half way open or...

Page 19

SERVICE & MAINTENANCE
 
19  
Aarrow Ecoburn Stoves     
FIRE DOOR ROPE  
REPLACEMENT 
 
Periodically, visually check over the fire door rope 
seal for any damage, cuts or tears and any  
detached sections. The rope gasket can be  
replaced, using the universal rope kit (see spare 
parts guide Page 32), please follow the  
instructions below : 
 
 
Ensure the appliance is cold. 
 
  Lift the door off the appliance and lay onto a 
flat surface with the rear face upwards.  
 
  Carefully remove the old...

Page 20

Aarrow Ecoburn Stoves 
20  SERVICE & MAINTENANCE
 
 
 
 
 
 
Please Note —This should be carried out when 
the fire is cold and unlit. 
  FIRE DOOR PRIMARY AIR INLET
 
 
Once a year inspect the primary air inlet assembly 
located at the base of the fire door.  
 
  Lift the door assembly from the stove body 
and place on a level, work bench, with the 
rear face upper most. 
 
  Remove the 2x no. fixings. 
 
  Working from the front, withdraw the oval 
assembly from the door casting. 
 
  Clean the...
Start reading Aarrow Fires Arrow Ecoburn operating and Installation Manual

Related Manuals for Aarrow Fires Arrow Ecoburn operating and Installation Manual

All Aarrow Fires manuals