Home > AirComm Corporation > Air Conditioner > AirComm Corporation Bell Air Conditioner206AB Installation Instructions TORQLOK PLUMBING

AirComm Corporation Bell Air Conditioner206AB Installation Instructions TORQLOK PLUMBING

    Download as PDF Print this page Share this page

    Have a look at the manual AirComm Corporation Bell Air Conditioner206AB Installation Instructions TORQLOK PLUMBING online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 74 AirComm Corporation manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							 
    AIR COMM CORPORATION 
    Boulder Municipal Airport 
    3330 Airport Road 
    Boulder, CO.  80301 
    [email protected] 
     
    Report 206EC-250M 
     
     
     
     
     
    BELL 206A/B CABIN AIR CONDITIONING 
    SYSTEMS INSTALLATION INSTRUCTIONS 
    (TORQ-LOK PLUMBING) 
     
     
     
     
     
     
     
      This Document contains: 
     
     Flight Manual Supplement 
     STC Certificate 
     Service Instructions 
     
     
     
     
     
     
    REV E  8 September 2011  
    						
    							 Page i 
     206EC-250M 
     Rev E 
     
     
    Revisions 
     
     Rev  Date   Description    Appl 
     
     A  03/07/05  
    Page II-1- Added data for evap blower motor  
          change and correct dual fwd evap arm.  
                ES61142-1 motor weighs .75 lbs more than   
                ES61060-2 motor. Pg. 5- added Fasco motor to list. 
                Revised Pgs 17 and 18 to include both the    
          ES61060-2 (Panasonic motor) and the  
          ES61142-1 motor (Fasco
    ) 
     
     B  09/22/05  
    Part number ES61060-2 blower motor replaced 
                With part number ES61064-1. Page 5 of 20. 
           
    C    12/27/2007    Part number ES57008-2 Replaced by 
            part number ES57178-1. Pages 4 of  
            20, 5 of 20, 17 of 20 and 18    RM  
        of 20 
     
      D    10/7/08    Part number ES26112-4 Replaced by  
          part number ES26194-4. Pages I, 1 of 20,  
          5 of 20, and 19 of 20.  RM  
     
    E    9/8/11     Changed Overhaul / Replacement schedule 
    criteria. Page 14 of 21. 
               RL 
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
      
    						
    							 Page ii 
     206EC-250M 
     Rev E 
     
    Table of Contents 
     
    Item           Page 
     
    Revisions          i 
     
    Introduction          1 
     
    References          1 
     
    Installation Instructions        I – 1 
     
    Weight & Balance Data        II – 1 
     
    Post Installation Check List       III – 1 
     
    Customer Feedback        IV – 1 
     
    STC Certificate         V – 1 
     
    Flight Manual Supplement        VI – 1 
     
    Appendix A          VII – 1 
     
    Maintenance Instructions- 
    Bell 206 A/B Air Conditioning System. 
     
    Appendix B 
     
    Warranty & Parts Return Procedure            VIII – 1 
     
     
     
     
     
     
     
     
     
     
     
     
     
     
      
    						
    							 Page 1 
     206EC-250M 
     Rev E 
    Introduction 
     
    This document provides maintenance and service information for the ACC 206EC-201 
    Cabin Air Conditioning system installation in the Bell 206 A/B helicopter. 
     
    The drawings listed below are considered to be a part of this document. 
     
    Reference Documents 
     
    1.  Dwg 206EC-201 General Arrangement – 206 A/B Air Conditioner system  
    (Torq-Lok). 
     
    2.  Dwg 206EC-304 Compressor Installation. 
     
    3.  Dwg 206EC-548 Plumbing Installation. 
     
     
    4.  Dwg 206EC-646 Single Forward Evaporator Installation. (L/H Primary) 
     
     
    5.  Dwg 206EC-648 Dual Forward Evaporator Installation. 
     
     
    6.  Dwg 206EC-628 Aft Evaporator Installation. 
     
     
    7.  Dwg 206EC-682 Air Distribution System.  
     
     
    8.  Dwg 206EC-728 Condenser Installation. 
     
     
    9.  Dwg 206EC-854 Electrical Installation. 
     
     
     
     
     
     
     
     
     
     
     
     
      
    						
    							  Page I – 1 
     206EC-250M 
     Rev E 
     
     
     
     
     
     
     
     
     
     
     
     
     
     
    INSTALLATION INSTRUCTIONS 
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
      
    						
    							  Page I – 2 
     206EC-250M 
     Rev E 
     
    Installation Instructions 
     
    General Arrangement 
     
    1.  Disconnect battery, open engine cowling, remove the two (2) access panels on 
    each side of the instrument console. 
     
    2.  Remove the upper and aft baggage compartment panels. 
     
     
    3.  Remove “hat rack” and aft cabin headliners. 
     
     
    4.  Care should be taken to prevent contamination of the Air Conditioner system.  All 
    end plugs on all plumbing assemblies and system components should not be 
    removed until the components are connected. If the system becomes 
    contaminated, it must be flushed according to the procedures presented in 
    Appendix A. 
     
     
    Compressor Installation 
     
    Install in accordance with the installation instructions, drawing notes and information on 
    the face of the drawing. 
     
    Plumbing Installation 
     
    1.  Thoroughly review drawing and drawing notes. 
     
    2.  Install system according to drawing requirements. 
     
     
    3.  Check off all items on the drawing to insure that the installation is complete. 
     
     
    Forward Evaporator Installation 
     
    Install in accordance with the installation instructions, drawing notes and information on 
    the face of the drawing. 
     
     
     
     
     
    Installation instructions continued on next page.  
    						
    							  Page I – 3 
     206EC-250M 
     Rev E 
    Installation instructions continued: 
     
    Aft Evaporator Installation 
     
    Install in accordance with the installation instructions, drawing notes and information on 
    the face of the drawing. 
     
    Air Distribution Installation 
     
    Install in accordance with the installation instructions, drawing notes and information on 
    the face of the drawing. 
     
    Condenser Installation 
     
    Install in accordance with the installation instructions, drawing notes and information on 
    the face of the drawing. 
     
    Electrical Installation 
     
    1.  Thoroughly review drawing and all drawing notes. 
     
    2.  Install system according to drawing requirements. 
     
     
    3.  Check off all items on the drawing to insure that installation is complete. 
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
      
    						
    							  Page II – 1 
     206EC-250M 
     Rev E 
     
     
    WEIGHT AND BALANCE DATA 
     
    Correct aircraft empty weight and center of gravity as indicated below: 
     
      ITEM     Wt.  Arm  Mom. 
           (lbs)  (in.)  (in-lbs) 
     
     
    206 A/B Installation 
     
    * 206EC-201-1 Air Conditioner    82.57  128.9  10644 
    (Standard – one L/H Fwd. & one Aft. Evap) 
    S-6078EC-1 Aft Evap Blower- Panasonic 
     
     
    206EC-201-1 Air Conditioner       83.4    129.11  10762 
    (Standard – one L/H Fwd. & one Aft. Evap) 
    S-6102EC-1 Aft Evap Blower- Fasco 
     
     
    206EC-201-2 Air Conditioner   82.57  128.9  10644 
    (One R/H Fwd. & one Aft. Evap) 
    S-6078EC-1 Aft Evap Blower- Panasonic 
     
    206EC-201-2 Air Conditioner 
    (One R/H Fwd. & one Aft. Evap)   83.4  129.11 10762 
    S-6102EC-1 Aft Evap Blower- Fasco 
     
     
    206EC-201-3 Air Conditioner   94.00  117.5  11049 
    (Dual Fwd. & one Aft. Evap) 
    S-6078EC-1 Aft Evap Blower- Panasonic 
     
    206EC-201-3 Air Conditioner   94.75  118.1  11194 
    (Dual Fwd. & one Aft. Evap) 
    S-6102EC-1 Aft Evap Blower- Fasco 
     
     
     
    *S-6102EC-1 Aft evap. Blower with Fasco motor replaces S-6078EC-1 with Panasonic 
    motor 
     
     
      
    						
    							  Page III – 1 
     206EC-250M 
     Rev E 
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
    POST INSTALLATION CHECK LIST 
     
     
     
      
    						
    							POST AIR CONDITIONING SYSTEM INSTALLATION 
    CHECKLIST 
    Confirmation of proper direction of rotation of Evaporator  Blower Wheels. 
    (See  Electrical  System Dwg.) 
    Note: 
    Blower will work with  blower  wheel rotating in incorrect direction, 
    But airflow  will be significantly  decreased, degrading system performance. 
    _ Refrigerant Plumbing system  oil charged.  (See Plumbing Inst! Dwg.) 
    _  Check  Compressor  hose routing  and clamping  to avoid  hose kinking  in the  bend 
    radius 
    _  Check  Condenser  Blower to insure  that fan bladelhousing  clearing exist. Look  for 
    wear  marks  on inside 
    of fan  shourd. If rubbing  exist contact  Air Comm  Corporation 
    _ 
    Prior to  charging  the system,  we recommend  leak checking  with dry nitrogen  at 
    (150 psi) using  soap and water  solution  to bubble  check connections. 
    _  Charge  system according  to instructions. 
    If system  is undercharged  or overcharged 
    the 
    AIC will  not work  provide  maximum  cooling. For R-134a  system,  overcharging 
    system  will degrade  performance  more than slightly  undercharging. 
    _  Leak  check  all joints  after system  charging,  using an electronic  leak detector*.  This 
    is  critical to  insure continued  optimum 
    AlC performance. Use torque seal after 
    torquing 
    of joints  and leak  checkhas  satisfactorily  been performed. 
    *Note: 
    Using other than an electronic detector for final leak detection  is 
    unreliable and may allow some slow leaks  to go undetected 
    _  Check  Evaporator  air ducting 
    to insure that: 
    _ Ducts  are securely  clamped  to duct  connections 
    _ Duct  liner wire is in  place  to preclude  collapse. 
    _  Insure  louvers  are properly  installed per drawing. 
    _The Condenser  Heat Exchanger  rubber seal strip  is properly  positioned  to insure  a 
    complete seal  exist between  the condenser  heat exchanger  and lower  aft fuselage 
    f  airing.  Inspect  condenser  inlet screen  for proper  security. 
    _  The three  lightening  holes located  at the  lower  aft edge 
    of baggage  floor are properly 
    sealed.  (See Condenser 
    lnst Dwg). 
    _  Insure  proper  alignment 
    of compressor  and tail rotor  drive  pulley.  Check for proper 
    belt  tension 
    per drawing,  Inspect for correct  mounting of compressor per drawing. 
    PLEASE  RETURN  CHECKLIST  AND CUSTOMER FEED 
    BACK 
    FORMS  TO HELP ACC MAINTAIN CUSTOMER 
    SATISFACTION  
    						
    All AirComm Corporation manuals Comments (0)

    Related Manuals for AirComm Corporation Bell Air Conditioner206AB Installation Instructions TORQLOK PLUMBING