    Have a look at the manual Land Rover Lt230t Transfer Box Overhaul 3rd Edition Rover Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 364 Land Rover manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							TRANSFER BOX
    36
    OVERHAUL High/low cross shaft housing
    1.Lubricate cross shaft and new’O’ring with
    recommended oil.
    2.Insert cross shaft into housing, position
    high/low selector finger on shaft.
    3.Fit’O’ring to shaft, locate end of shaft in
    hollow plug.
    4.Slide’O’ring on to end of shaft.
    5.Align hole in high/low selector finger with
    recess in cross shaft.
    6.Apply Loctite 290 to threads of setscrew, fit
    and tighten screw.
    7.Apply Hylomar PL32 sealant to threads of low
    detect switch - if fitted. Fit switch, do not tighten
    locknut until switch has been adjusted.
    NOTE: Switch must be adjusted after
    transfer box is installed in vehicle.Differential lock selector
    1.Lubricate new’O’rings with recommended oil,
    fit to selector finger shaft and housing.
    2.Insert selector finger shaft into housing.
    3.Fit selector lever ensuring that relative
    positions of lever and finger are as shown.
    4.Fit washer and new self-locking nut, tighten nut
    to 15 Nm (11 lbf.ft). 
    						
    							TRANSFER BOX
    OVERHAUL37
    TRANSFER BOX ASSEMBLING
    1.Lubricate all components with recommended
    oil.
    CAUTION: Where use of gaskets is
    specified, gaskets must be fitted; do not
    use sealant.
    Mainshaft input gear bearing pre-load
    1.Position mainshaft input gear assembly in main
    casing.
    2.Up to serial no. 288709E:Fit a new mainshaft
    input gear bearing housing gasket, dry on main
    casing.
    3.All transfer boxes:Fit mainshaft input gear
    bearing housing ensuring reference marks are
    aligned.
    4.Fit 2 M10 x 25 mm bolts and tighten to 25 Nm
    (18 lbf.ft).
    5.Position suitable DTI with stylus of gauge
    contacting end of mainshaft, push mainshaft
    rearwards and zero gauge.
    6.Push mainshaft forwards and note gauge
    reading.7.Calculate thickness of shim required using the
    formula A + B + C = D where:
    A = Thickness of installed shim - 3.15 mm
    (0.12 in)
    B = Recorded end-float
    C = Required pre-load - 0.05 mm (0.002 in)
    D = Thickness of shim required
    8.If an alternative shim is required to establish
    correct end-float, proceed as follows:
    NOTE: Do not remove mainshaft input
    gear bearing housing if bearing pre-load is
    correct.
    9.Remove 2 bolts, remove mainshaft input gear
    bearing housing.
    NOTE: Up to serial no. 288709E, retain
    gasket on main casing.
    10.Using a soft metal drift, carefully drive input
    gear bearing track out of bearing housing,
    remove shim.
    CAUTION: If bearing track is damaged
    during this operation, a new track must be
    fitted.
    11.Select required shim from the range available.
    NOTE: Shims are available from 3.15 to
    4.00 mm (0.12 to 0.16 in) thickness rising
    in increments of 0.05 mm (0.002 in).
    12.Fit selected shim and using a suitable mandrel,
    fit input gear bearing track.
    13.Fit mainshaft input gear bearing housing and
    temporarily secure using 2 M10 x 25 mm bolts
    tightened to 25 Nm (18 lbf.ft). 
    						
    							TRANSFER BOX
    38
    OVERHAUL Rear output housing
    1.Up to serial no. 288709E:Position a new
    gasket, dry on main casing.
    2.From serial no. 288709E:Apply Hylosil RTV
    102 sealant to mating flange of rear output
    housing.
    3.Fit rear output housing to main casing.
    NOTE: Dowel located.
    4.Apply Loctite 290 to threads of bolts and
    shoulder bolt.
    5.Fit washers to 2 bolts.
    6.Fit bolts and tighten by diagonal selection to 45
    Nm (33 lbf.ft).
    7.Fit output flange, new felt and steel washers to
    output shaft.
    8.Fit a new self-locking nut.
    9.Position propeller shaft flange holding tool
    LRT-51-003to output flange.
    10.Restrain flange, tighten nut to 162 Nm (120
    lbf.ft).
    11.Lubricate a new’O’ring with recommended oil
    and fit to vehicle speed sensor - if fitted.
    12.Fit vehicle speed sensor - if fitted.
    13.Fit and tighten Allen screw. 
    						
    							TRANSFER BOX
    OVERHAUL39
    Differential bearing pre-load
    1.Position high/low selector shaft and fork to
    differential ensuring that fingers of selector fork
    are located in high/low selector sleeve.
    2.Position high/low selector shaft and differential
    in main casing ensuring that splines of rear
    output shaft are engaged in differential.
    3.Position new differential front bearing outer
    track on bearing ensuring that track is seated
    squarely.
    4.Position setting block, toolLRT-41-014/3on
    main casing.
    5.Screw pillarLRT-41-014/4into tapped hole in
    main casing.
    6.Assemble DTILRT-99-006to pillar.
    7.Position stylus of DTI to setting block, zero
    gauge.
    8.Position stylus of gauge on front bearing outer
    track, record reading obtained.
    9.Position stylus of gauge on opposite side of
    bearing track, record reading obtained.
    CAUTION: Ensure that bearing outer track
    is not disturbed when carrying out above
    operations.
    10.Establish average of the 2 readings, record
    figure obtained. 
    						
    							TRANSFER BOX
    40
    OVERHAUL
    11.Position front output housing as shown.
    12.Up to serial no. 288709E:Position a new
    gasket, dry, on front output housing.
    13.Position depth block, toolLRT-41-014/2and
    cross-bar, toolLRT-41-014/1on front output
    housing.
    14.Position DTILRT-99-006on cross-bar
    LRT-41-014/1.
    15.Zero DTI on depth blockLRT-41-014/2.
    16.Position DTI to cross-barLRT-41-014/1,record
    reading obtained.
    17.Remove tools.
    18.Up to serial no. 288709E:Remove and retain
    gasket.
    19.Using the formula:
    3.05 mm (0.120 in) + B - A = D where:
    B = Height difference recorded between depth
    block and cross bar
    A = Average of readings to differential front
    bearing outer track
    D = Thickness of shim required to give
    differential bearing pre-load of 0.05 mm (0.002
    in)
    20.From resultant figure obtained, select
    appropriate thickness shim from the range
    available.
    NOTE: Shims are available from 2.00 to
    3.25 mm (0.08 to 0.13 in) thickness rising
    in increments of 0.05 mm (0.002 in).21.Retain selected shim and differential front
    bearing outer track with front output housing.
    22.Up to serial no. 288709E:Retain gasket with
    front output housing.
    23.Carry out assembly of front output housing-
    See Component assembling. 
    						
    							TRANSFER BOX
    OVERHAUL41
    Front output housing
    1.Up to serial no. 288709E:Fit gasket used
    when determining differential bearing pre-load,
    dry, to main casing.
    2.From serial no. 288709E:Apply Hylomar RTV
    102 sealant to mating flange of front output
    housing.
    All transfer boxes
    3.Fit front output housing ensuring that splines of
    output shaft are engaged in differential and that
    internal splines of dog clutch are engaged with
    teeth of output shaft.
    4.Apply Loctite 290 to threads of bolts, fit bolts
    noting that longest bolt is inserted through
    high/low selector finger housing.
    5.Tighten bolts by diagonal selection to 25 Nm
    (18 lbf.ft).
    6.Fit output flange, new felt and steel washers to
    output shaft.
    7.Fit a new self-locking nut.
    8.Position propeller shaft flange holding tool
    LRT-51-003to output flange.
    9.Restrain flange, tighten nut to 162 Nm (120
    lbf.ft).
    10.Compress differential lock selector spring and
    fit to selector fork.
    11.Locate fingers of selector fork in groove in dog
    clutch.
    12.Fit differential lock selector shaft ensuring end
    of shaft is located in recess in rear of housing.
    13.Rotate selector shaft until the two flats for the
    retaining clips are at right angles to the cover
    plate mating face. 
    						
    							TRANSFER BOX
    42
    OVERHAUL
    14.Compress selector spring and fit retaining clips
    at each end of spring.
    CAUTION: Ensure ends of spring are fully
    seated in recess in clips.
    15.Fit differential lock detent ball and spring.
    16.Apply Loctite 290 to threads of detent plug.
    17.Fit and tighten detent plug then unscrew 2 full
    turns.
    18.Ensure’O’ring is correctly located on
    differential lock selector housing.
    19.Fit differential lock selector assembly ensuring
    that selector finger is located in recess in
    differential lock selector shaft.
    20.Apply Loctite 290 to threads of bolts.
    21.Fit bolts and tighten to 25 Nm (18 lbf.ft).
    22.Operate differential lock selector lever and
    check that differential lock detent ball can be
    felt to positively engage and disengage with
    grooves in selector shaft; screw detent plug in
    or out until setting is correct.
    23.Early boxes:Fit locknut to differential lock
    warning lamp switch.
    24.Later boxes:Fit spacer to differential lock
    warning lamp switch ensuring that counterbore
    on spacer is towards top of switch.
    25.Apply Hylomar PL32 sealant to threads of
    differential lock warning lamp switch, fit and
    tighten switch.
    CAUTION: Do not allow sealant to contact
    switch plunger and where switches are
    fitted with a locknut, do not tighten
    locknut or fit differential lock side cover until
    switch has been adjusted.
    Switches fitted with a spacer
    26.Apply sealant, Part No. STC 3254 to mating
    face of differential lock side cover, fit cover.
    27.Apply Loctite 290 to threads of side cover
    bolts, fit bolts and tighten to 25 Nm (18 lbf.ft). 
    						
    							TRANSFER BOX
    OVERHAUL43
    All boxes
    28.Up to serial no. 288709E:Apply grease to new
    high/low selector housing gasket, position
    gasket on front output housing.
    29.From serial no. 288709E:Apply sealant, Part
    No. STC 3254 to mating flange of high/low
    selector housing.
    30.Fit housing ensuring that high/low selector
    finger is located in recess in high/low selector
    shaft.
    31.Fit 6 bolts and tighten to 25 Nm (18 lbf.ft).Intermediate gears
    CAUTION: The spacer fitted must be of the
    selective length, non-collapsible type, DO
    NOT fit a collapsible spacer.
    1.Using a micrometer, measure the width of each
    bearing inner track.
    2.Record each reading as measurement’A’and
    ’B,’both measurements should fall within range
    of 21.95 to 22.00 mm (0.864 to 0.866 in). 
    						
    							TRANSFER BOX
    44
    OVERHAUL
    3.Fit bearing inner track’A’on to tool post
    ofLRT-41-017and position intermediate gears
    on to bearing’A.’
    4.Fit bearing inner track’B’to intermediate
    gears, apply finger pressure to bearing inner
    tracks and rotate gears 5 to 10 turns to settle in
    bearing rollers.
    5.Attach a DTI to base ofLRT-41-017, zero
    gauge on top of tool post and take 2
    measurements at 180°of the step height
    between the top of the tool post and the inner
    track of the bearing, take an average of the 2
    readings and record this as measurement’C’.
    Measurement’C’should be in the range of
    0.15 to 0.64mm (0.006 to 0.025in).
    6.Using the formula 103.452mm (4.0729in) -’A’-
    ’B’-’C’calculate the length of bearing spacer
    required. From the result of the calculation
    round DOWN to the nearest length of spacer
    available to give a correct bearing pre-load of
    0.05mm (0.002in).
    NOTE: There are 40 selective spacers
    available ranging in length from 58.325mm
    (2.296in) to 59.300mm (2.335in) in
    increments of 0.025mm (0.001in).
    7.Remove intermediate gear assembly from
    LRT-41-017.
    8.Lubricate and fit bearings and selected spacer
    to intermediate gears.
    9.Wrap a suitable length of wire around
    intermediate gears and using assistance, lower
    gears into main casing ensuring that they are
    meshing with input and differential gears.
    CAUTION: Do not remove wire at this
    stage.
    10.Lubricate new’O’rings with recommended oil
    and fit to intermediate shaft and main casing. 
    						
    							TRANSFER BOX
    OVERHAUL45
    11.Raise intermediate gears until dummy shaft
    LRT-41-004can be inserted from front output
    housing side of main casing.
    12.Fit intermediate shaft, drift shaft into position
    whilst at the same time expelling dummy shaft
    LRT-41-004 .
    CAUTION: Ensure’O’ring is not displaced
    from main casing.
    13.Remove wire from around intermediate gears.
    14.Rotate intermediate shaft until retaining plate
    can be located on flat on shaft.
    15.Apply Loctite 290 to threads of retaining plate
    bolt.
    16.Fit bolt and tighten to 25 Nm (18 lbf.ft).
    17.Fit a new intermediate shaft nut and tighten to
    88 Nm (65 lbf.ft).
    CAUTION: Do not stake nut at this stage.
    18.Select neutral.
    19.Screw a suitable bolt into tapped hole in end of
    toolLRT-41-005.
    20.Insert toolLRT-41-005in end of mainshaft.
    21.Using a suitable torque meter on tool
    LRT-41-005, check torque to turn of transfer
    box gear train :
    Torque to turn = 2.2 Nm (19 lbf.in)
    22.If torque to turn figure is incorrect, intermediate
    gear bearing pre-load setting procedure must
    be repeated. When torque to turn figure is
    correct, remove toolLRT-41-005and stake
    flange of intermediate shaft nut into recess in
    intermediate shaft.
    NOTE: Discovery cover plate illustrated.
    23.Up to serial no. 288709E:Fit and tighten 2
    countersunk screws to secure mainshaft input
    gear bearing housing.
    24.Remove bolts used to temporarily secure
    mainshaft input gear bearing housing. 
    						