Home > NEC > Communications System > NEC Neax 2000 Ivs Installation Procedure Manual

NEC Neax 2000 Ivs Installation Procedure Manual

    Download as PDF Print this page Share this page

    Have a look at the manual NEC Neax 2000 Ivs Installation Procedure Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1168 NEC manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							CHAPTER 3 ND-45492 (E)
    Pag e 1 4
    Revision 2.0
    1.3 PROCEDURE FOR UNPLUGGING/PLUGGING CIRCUIT CARDS
    When removing a circuit card from the PIM or when mounting a circuit card in the PIM, follow the procedure
    given in Table 3-1 below.
    Table 3-1  Procedure for Unplugging/Plugging Circuit Cards
    CIRCUIT CARDPROCEDURE
    CONDITION
    PLUG UNPLUG
    • SPN-CP00/CP03 (MP)
    • PZ-PW86 (PWR)
    • SPN-PW00 (PWR)Power off
    ß
    Plug in
    ß
    Power onPower off
    ß
    Unplug
    ß
    Power onThese circuit cards must be plugged in or unplugged 
    only with power off to prevent damage to the card or 
    other system circuitry.
    • SPN-CP01 (FP)
    • SPN-CP02 (MP)
    • SPN-BS00 (BS00)
    • SPN-BS01 (BS01)
    • SPN-AP00 (AP00)
    • SPN-ME00 (EXTMEM)
    • SPN-24DTA (DTI)
    • SPN-SC00 (CCH)
    • SPN-SC01 (DCH)
    • SPN-SC02 (ICH)
    •SPN-CK00 (PLO)
    • SPN-4RSTB (MFR)
    • SPN-AP01 (AP01)
    •SPN-VM00Power off or
    MB switch on
    ß
    Plug in
    ß
    Power on or
    MB switch offPower off or
    MB switch on
    ß
    Unplug
    ß
    Power onThese circuit cards must be plugged in or unplugged 
    under Make Busy condition or power off to prevent 
    damage to the card or other system circuitry.
    • PN-CC00 (ETHER) Refer to the OAI System Manual. 
    						
    							ND-45492 (E) CHAPTER 3
    Page 15
    Revision 2.0
    CAUTION
    The installer must hold the edge of circuit card when plugging or unplugging the circuit card.  If you touch
    another area, you may be exposed to hazardous voltages.
    PBX
    CARD FRONT
    NEVER TOUCH THE COMPONENTS OR 
    SOLDERED SURFACE WITH BARE HANDS. 
    						
    							CHAPTER 3 ND-45492 (E)
    Pag e 1 6
    Revision 2.0
    2. PROCEDURE
    This section explains the procedures for installing the NEAX2000 IVS system. The installer should follow the
    procedure shown in the following flowchart. In the flowchart, a NAP number is denoted to the right side of each
    step. The NAP Number refers to the details for each procedure.
    Figure 3-2  Procedure Flowchart (1 of 2)
    START
    UNPACKING
    MARKING AND DRILLING
    INSTALLATION
    OF
    MAIN EQUIPMENT
    CONNECTION
    OF
    BATTERY
    TERMINATION OF
    CABLES ON THE MDFINSTALLATION
    OF
    PERIPHERAL EQUIPMENT
    CABLE RUNNING
    SWITCH SETTING
    OF
    CIRCUIT CARDS
    ANAP- 200-001
    NAP- 200-002
    NAP- 200-003
    NAP- 200-004
    NAP- 200-005
    NAP- 200-006
    NAP- 200-007
    REFER TO CIRCUIT CARD MANUAL TO THE MDF 
    						
    							ND-45492 (E) CHAPTER 3
    Page 17
    Revision 2.0
    Figure 3-2  Procedure Flowchart (2 of 2)
    The mark shown below is attached to the NAP sheet for each procedure in which circuit cards are handled. When
    doing such a procedure, the installer must perform the procedure with caution, to prevent damage caused by stat-
    ic electricity (See section 1.2, “Static Electricity Precautions” in this chapter).
    A
    END MOUNTING
    MOUNTING OF THE FRONT COVEROF 
    CIRCUIT CARDS
    SYSYEM INITIALIZATION
    AND
    SYSTEM DATA ENTRY
    OPERATION TEST NAP- 200-008
    NAP- 200-010
    NAP- 200-011
    NAP- 200-012
    CLEANING
    AND
    VISUAL CHECK
    NAP- 200-013
    INSTALLATION OF 
    BACK UP MP SYSTEMNAP- 200-009
    TYPE OF SYSTEMBack up MP System
    Single  MP System
    ATTENTION
    Contents
    Static Sensitive
    Handling
    Precautions Required  
    						
    							CHAPTER 3 ND-45492 (E)
    Pag e 1 8
    Revision 2.0
    1. Unpacking Procedure
    (1) Check the received quantity of packages containing the NEAX2000 IVS system with the description on the
    shipping document.
    (2) Check the packaging for external damage done by transportation and record it as necessary.
    (3) Unpack the packaging.
    • For unpacking the packages containing circuit cards, a grounded wrist strap should be worn.
    (4) Check the quantity of equipment and materials unpacked with the shipping document.
    (5) Perform visual inspection, checking for the following items.
    NAP 200-001
    Sheet 1/2
    Unpacking
    Modules Overall distortion.
    Scratches and dents on the surface.
    Scratches and cracks on the PIM Backplane.
    Broken or bent pins on the PIM Backplane.
    Covers Scratches and dents.
    Circuit Cards Overall distortion
    Scratches and cracks
    Loss, or damage of parts on the circuit cards.
    Attendant Console Scratches and cracks on the keyboard
    Overall distortion
    Damage to keys and lamps.
    AT TENTION
    Contents
    Static Sensitive
    Handling
    Precautions Required  
    						
    							ND-45492 (E) CHAPTER 3
    Page 19
    Revision 2.0
    Figure 001-1  Unpacking of Main Equipment
    NAP 200-001
    Sheet 2/2
    Unpacking
    RACK PARTS
    ACCESSORIES
    PIM 
    						
    							CHAPTER 3 ND-45492 (E)
    Pag e 2 0
    Revision 2.0
    1. Confirmation of the Equipment Layout
    Install the equipment in an area which provides adequate ventilation and is easily accessible to service person-
    nel.
    2. Marking
    2.1. Floor Standing
    • Referring to Figure 002-1, mark the installation holes for the main equipment.
    • Mark the installation holes for the external MDF, if required.
    Figure 002-1  Floor Marking for Main Equipment
    NAP 200-002
    Sheet 1/3
    Marking and Drilling
    356 mm (14.01 inch)
    430 mm (16.93 inch)
    FRONT
    RACK PARTS
    WALL
    39 mm (1.54 inch)
    110 mm (4.33 inch)
    35 mm (1.37 inch)
    37 mm (1.46 inch)
    356 mm (14.01 inch)
    430 mm (16.93 inch)
    FRONT
    RACK PARTS
    37 mm (1.46 inch)
    40 mm (1.57 inch)
    184 mm (7.24 inch)
    5 mm (0.19 inch) 
    						
    							ND-45492 (E) CHAPTER 3
    Page 21
    Revision 2.0
    2.2. Wall Mounting
    • Locate and mark the wall mounting points as shown in Figure 002-2.
    Figure 002-2  Wall Mounting Points
    NAP 200-002
    Sheet 2/3
    Marking and Drilling
    PIM
    PIM
    PIM
    PIM
    ANCHOR (x4/PIM)
    430 mm 
    (16.9 inch)
    BASE
    250 mm (9.8 inch)
    350 mm 
     (13.8 inch)
    40 mm (1.6 inch)
     BASE BOTTOM POSITION 
     PBX BOTTOM POSITION 
    PIM390 mm 
     (15.4 inch)
    430 mm 
    (16.9 inch)
    5 mm (0.2 inch)
    382 mm 
     (15.0 inch)
    350 mm 
     (13.8 inch)
    350 mm 
     (13.8 inch)
    350 mm 
     (13.8 inch)
    86 mm (3.4 inch) 
    						
    							CHAPTER 3 ND-45492 (E)
    Pag e 2 2
    Revision 2.0
    3. Drilling 
    • Drilling and installing anchor bolts
    Figure 002-3  Instruction for Anchor Bolt
    NAP 200-002
    Sheet 3/3
    Marking and Drilling
    (4) (3) (2) (1)
    (1) DRILL A HOLE IN THE CONCRETE WITH A  
    DRILL SUITABLE FOR A PLUG BOLT A LITTLE 
    DEEPER THAN THE PLUG BOLT LENGTH.
    (2) INSERT THE ANCHOR BOLT INTO THE HOLE.
    (3) PUSH ANCHOR BOLT UNTIL THE 
    BOLT STAYS PERMANENTLY IN PLACE.
    (4) TURN BOLT COUNTERCLOCKWISE AND 
    REMOVE. 
    						
    							ND-45492 (E) CHAPTER 3
    Page 23
    Revision 2.0
    Install the main equipment according to the desired procedure for either Floor Standing, Wall-Mounting, 19-Inch
    Rack-Mounting or Desk Top installation.
    1. Floor Standing Installation
    (1) Connect the RACK PARTS to the rear side of the BASE with 4 bolts provided.
    Figure 003-1  Connection of RACK PARTS and BASE
    NAP 200-003
    Sheet 1/37
    Installation of Main Equipment
    REARBASE RACK PARTS 
    						
    All NEC manuals Comments (0)

    Related Manuals for NEC Neax 2000 Ivs Installation Procedure Manual