Home > Panasonic > > Panasonic Crs 1 Service Manual

Panasonic Crs 1 Service Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Panasonic Crs 1 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 10737 Panasonic manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							 
        · 
        Assembly of UD rack R
    Step 27: Use the screwdriver to turn the hole on the UD
    gear 2 align with the pitch plate hole.
    Step 28: Insert the UD rack R as arrow shown.
    Step 29: Push the UD rack R as arrow shown.
     
        · 
        Assembly of UD rack L
    Step 30: Insert the UD rack L as arrow shown.
    Step 31: Push the claw as arrow shown.
    81
    CRS1 
    						
    							Step 32: Pull the UD rack L as arrow shown.
     
        · 
        Assembly of tray drive rack
    Step 33: Install the tray drive rack as arrow shown.
     
        · 
        Assembly ofplay lever B
    Step 34: Install the play lever B below the rib.
    82
    CRS1 
    						
    							7.2.2. Assembly of Disc Trays
    Step 1: Tilt and fix the 5 disc trays as arrows shown.
    Step 2: Push the 5 disc trays as arrow shown until it stop.
    Step 3: Push the tray drive rack as arrow shown until it
    stop.
     
        · 
        Assembly of lock lever 1
    83
    CRS1 
    						
    							Step 4: Fix the lock lever 1 onto the pitch plate as arrow
    shown in sequence.
    Step 5: Press and hold the claw at the pitch plate then
    push the UD rack R as arrows shown.
    Step 6: Push the claw and slide the UD rack L as arrows
    shown.
     
        · 
        Assembly of UD connection lever
    84
    CRS1 
    						
    							Step 7: Install the UD connection lever.
     
        · 
        Follow the (Step 1) to (Step 12) of item 7.2.3. (Assembly of
    UD Base Assembly)
    7.2.3. Assembly of UD Base Assembly
    Step 1: Push the traverse slide plate as arrow shown.
    85
    CRS1 
    						
    							Step 2: Install the UD base assembly.
    Note: Ensure the UD base assembly seats properly into
    the groove s and engagewith theplay lever B and tray
    drive rack.
    Step 3: Turn the UD connection lever anti-clockwise, the
    UD base assembly will move downwards.
    Note: When the UD connection lever is turn and the
    UD base assembly did not movedownwards, check for
    step 1 to step 3 again.
    86
    CRS1 
    						
    							Step 4: Install the tray lock lever to the mechanism base
    and push the tray lock lever with a hand to fix it.
    Step 5: Push the disc trays back to the unit as arrow
    shown.
     
        · 
        Assembly of Trigger Slide Plate
    87
    CRS1 
    						
    							Step 6: Install the trigger slide plate, push forwards and
    push the trigger gear as arrows shown until locked by the
    claw.
    Step 7: Install the OC gear spring followe d by the OC gear
    assy.
    Caution: OC gear free to rotate after assembly
    88
    CRS1 
    						
    							Step 8: Install the open switch lever.
    Step 9: Install the gear cover as arrow shown.
    Step 10: Install the open lever spring.
    Step 11: Install the top cover, fix the top cover hook to the
    tray rear stopper as arrow shown.
    89
    CRS1 
    						
    							Step 12: Fix the top cover as arrow shown, the 2 claws
    should be latched.
    The mechanism unit will be ready to be checked using
    service jig or be mounted to the main unit for checking.
    7.2.4. Assembly of CD Loading P.C.B.
    Step 1: Install the plunger assembly as arrow shown, the
    catch should be latched.
    90
    CRS1 
    						
    All Panasonic manuals Comments (0)