    							Laboratory Activity (1.3) 
    - Peripheral 
    (1) USING 25 PAIR CABLES WITH MALE CONNECTORS ON ONE END, CONNECT FIVE CABLES TO THE 
    FOLLOWING RECEPTACLES: CN 0, CN 1, CN 10, CN 11, CN 12. 
    (2) RUN CABLES NEATLY FROM THE OMNI SBCS CABINET USING SCREWS TO FASTEN THE 
    CONNECTORS TIGHTLY TO THE RECEPTACLES. CONNECT EACH CABLE TO THE CDF BLOCK 
    DESIGNATED BELOW: 
    (A) CN 0 - FIRST STATION CDF BLOCK 
    (B) CN 1 - SECOND STATION CDF BLOCK 
    (C) CN 10 - FIRST STATION CDF BLOCK 
    (D) CN 11 - SECOND STATION CDF BLOCK 
    (E) CM 12 - POWER FAIL TRANSFER CDF BLOCK 
    (3) ENSURE THAT CDF BLOCKS ARE MOUNTED TO THE WALL. MARK EACH CABLE FOR EASY 
    IDENTIFICATION. 
    LAB MILESTONE: 
    . VERIFY THAT ALL CDF CABLES ARE INSTALLED CORRECTLY. 
    0 ASK INSTRUCTOR TO INSPECT INSTALLATION OF CABLES AND INITIAL YOUR 
    PERFORMANCE CHECKLIST. 
    . TURN TO REVIEW EXERCISE 1.3 AND ANSWER QUESTIONS l-3. 
    1.72  
    						
    							tory ffktivity (1.3) - Peripheral 
    tion (Contin 
    (4) WIRE CROSS CONNECTIONS AND INSTALL THE FOLLOWING STATION INSTRUMENTS USING THE 
    DESIGNATED CONFIGURATIONS: 
    -.- (A) 
    - (W 
    CG’ (C) 
    -/CD) 
    J (El 
    u:.l (F) 
    ‘ii! (G) 
    b’: (H) 
    LA) 
    ’ (J) 
    CS-10 TELEPHONE USING 8EKC CARD IN SLOT 01, CIRCUIT 0. DEFAULT STATION 
    DIRECTORY NUMBER WILL BE 208. DO NOT CONNECT THIS STATION TO THE MODULAR 
    JACK AT THIS TIME. IT WILL BE ADDED DURING A DATA BASE PROGRAMMING LAB 
    ACTIVITY. 
    CS-10 TELEPHONE USING 8EKC CARD IN SLOT 01, CIRCUIT 7. DEFAULT STATION DIRECTORY 
    NUMBER WILL BE 215. 
    CS-20 TELEPHONE USING 8EKC CARD IN SLOT 01, CIRCUIT 4. DEFAULT STATION 
    DIRECTORY NUMBER WILL BE 212. 
    CS-20 TELEPHONE USING 8EKC CARD IN SLOT 01, CIRCUIT 6. DEFAULT STATION 
    DIRECTORY NUMBER WILL BE 214. 
    BLFlDSS CONSOLE USING 8EKC CARD IN SLOT 01, CIRCUIT 5. BLF/DSS WILL BE 
    CONNECTED TO CS-20 TELEPHONE AT DIRECTORY NUMBER 212. 
    BLFIDSS CONSOLE USING 8EKC CARD IN SLOT 01, CIRCUIT 3. DO NOT CONNECT THIS 
    BLFlDSS AT THIS TIME. IT WILL BE ADDED DURING A DATA BASE PROGRAMMING LAB 
    ACTIVITY. THIS BLF/DSS WILL BE CONNECTED IN FUTURE TO THE CS-20 TELEPHONE AT 
    DIRECTORY NUMBER 214. 
    SINGLE LINE TELEPHONE INSTRUMENT USING 8SLC CARD IN SLOT 02, CIRCUIT 0. THIS 
    DIRECTORY NUMBER WILL BE 216. 
    9 
    SINGLE LINE TELEPHONE INSTRUMENT USING 8SLC CARD IN SLOT 02. CIRCUITPI. DEFAULT 
    STATION DIRECTORY NUMBER WILL BE -22-3: ,:I$  ‘;: v 
    CSD TELEPHONE USING ~DTC CARD IN SLOT 00, CIRCUIT 0. DEFAULT STATION< 
    DIRECTORY NUMBER WILL BE 200. 
    CSD TELEPHONE USING 8DTC CARD IN SLOT 00, CIRCUIT 1. DEFAULT STATION 
    DIRECTORY NUMBER WILL BE 201. 
    (5) LABEL EACH INSTRUMENT WITH THE APPROPRIATE STATION DIRECTORY NUMBER AND 
    EQUIPMENT NUMBER (CARD SLOT AND CIRCUIT NUMBER). 
    LAB MILESTONE: 
    . VERIFY THAT ALL STATION CROSS CONNECTIONS ARE WIRED AND THAT STATION 
    INSTRUMENTS ARE INSTALLED CORRECTLY. 
    . ASK INSTRUCTOR TO INSPECT CROSS CONNECTIONS AND STATION INSTALLATION AND 
    INITIAL YOUR PERFORMANCE CHECKLIST. 
    l TURN TO REVIEW EXERCISE 1.3 AND ANSWER QUESTIONS 4- 6 
    1.73  
    						
    							Laboratory Activity 
    (1.3) - Peripheral 
    Hnstallatio (Continue 
    GTE OMNU SBCS 
    (6) WIRE CROSS CONNECTIONS FOR THE POWER FAIL TRANSFER STATION: 
    (A) SINGLE LINE TELEPHONE INSTRUMENT USING 8SLC CARD IN SLOT 02, CIRCUIT 0 TO POWER 
    FAIL TRANSFER CDF BLOCK. 
    (B) POWER FAIL TRANSFER CARD (GPFT) IN SLOT 22, CIRCUIT 0 TO CO TRUNK ON 4BWC CARD 
    IN SLOT 18, CIRCUIT 0. 
    LAB MILESTONE: 
    e VERIFY THAT POWER FAIL TRANSFER CROSS CONNECTIONS ARE WIRED CORRECTLY. 
    . ASK INSTRUCTOR TO INSPECT THE CROSS CONNECTIONS AND INITIAL YOUR 
    PERFORMANCE CHECKLIST. 
    . TURN TO REVIEW EXERCISE 1.3 AND ANSWER QUESTION 7. 
    1.74  
    						
    							(7) VERIFY THAT POWER FAlL TRANSFER TRUNKS HAVE BEEN INSTALLED FROM CARD SLOT 18, 
    CIRCUIT 0. WIRE CROSS CONNECTIONS AND INSTALL THE FOLLOWING TRUNK LINES USING THE 
    DESIGNATED CONFIGURATIONS: 
    (A) THREE ADDITIONAL CO TRUNK LINES USING 4BWC CARD IN SLOT 18, CIRCUITS 1,2, 
    AND 3. 
    (B) TWO LOOP TIE LINES USING 2TTL CARD IN SLOT 16, CIRCUITS 0 AND 1. THESE TIE 
    LINES WILL BE USED TO ACCESS OTHER OMNI SBCS LAB SYSTEMS. INSTRUCTOR 
    WILL PROVIDE INSTRUCTIONS REGARDING CONNECTION. 
    (6) TWO E&M TIE LINE (TYPE II) USING 2TTE CARD IN SLOT 17, CIRCUITS 0 AND 1. THESE 
    TIE LINES WILL BE USED TO ACCESS OTHER OMNI SBCS LA5 SYSTEMS. INSTRUCTOR 
    WILL PROVIDE INSTRUCTIONS REGARDING CONNECTIONS. 
    LAB MILESTONE: 
    . VERIFY THAT ALL TRUNK LINE CROSS CONNECTIONS ARE WIRED CORRECTLY. 
    @ ASK INSTRUCTOR TO INSPECT CROSS CONECTIONS AND INITIAL YOUR PERFORMANCE 
    CHECKLIST. 
    . TURN TO REVIEW EXERCISE 1.3 AND ANSWER QUESTlbN 8. SUBMIT YOUR COMPLETED 
    REVIEW EXERCISE TO THE INSTRUCTOR FOR GRADING. 
    1.75  
    						
    							(8) CONNECT PORTABLE MAINTENANCE PANEL (PMP) TO OMNI SBCS CABINET. CONNECT DIN 
    PLUG OF EPSON CABLE #715 TO PORT MARKED “RS-232-C” ON BACK OF PMP. CONNECT DB-25 
    CONNECTOR END OF CABLE TO PORT CN13 (I/O 0) ON THE SBCS CABINET. 
    (9) ENSURE THAT BOTH OMNI SBCS AND PMP POWER SWITCHES ARE OFF. 
    (10) INSTALL FLOPPY DISKETTE UNIT TO PMP USING PROCEDURE FOUND IN THE STUDENT 
    WORKBOOK. DO NOT POWER ON THE PMP OR FLOPPY DISKETTE DRIVE UNIT UNTIL 
    INSTRUCTED TO DO SO DURING THE INITIALIZATION LAB ACTIVITY. 
    (11) CONNECT SMDR PRINTER CABLE TO PORT CN14 (I/O 1) ON THE SBCS CABINET. INSTRUCTOR 
    WILL PROVIDE SPECIAL INSTRUCTIONS RELATING TO TYPE OF PRINTER BEING INSTALLED. 
    PORT CONFIGURATION REQUIREMENTS WILL BE DISCUSSED DURING THE DATA BASE 
    ADMINISTRATION MODULE OF THIS COURSE. DO NOT POWER ON SMDR PRINTER UNTIL 
    DIRECTED TO DO SO. 
    LAB MILESTONE: 
    l VERIFY THAT PORTABLE MAINTENANCE PANEL, FLOPPY DISKETTE DRIVE, AND SMDR 
    PRINTER ARE CORRECTLY INSTALLED. 
    . ASK INSTRUCTOR TO INSPECT THESE INSTALLATIONS AND INITIAL YOUR 
    PERFORMANCE CHECKLIST. 
    o TURN TO REVIEW EXERCISE 1.3 AND ANSWER QUESTIONS 9-12. SUBMIT YOUR 
    COMPLETED REVIEW EXERCISE TO THE INSTRUCTOR FOR GRADING. 
    . YOU HAVE NOW COMPLETED THE BASIC PERIPHERAL INSTALLATION LAB ACTIVITY. 
    1.76  
    						
    							COMPLETE ALL OR PART OF THE FOLLOWlNG ACTIVITY IF TlME PERMITS OR IF INSTRUCTOR 
    DIRECTS YOU TO DO SO. 
    (1) WIRE CROSS CONNECTIONS AND INSTALL ONE OR BOTH OF THE FOLLOWING OPTIONAL 
    PERIPHERAL EQUIPMENT USING THE DESIGNATED CONFIGURATIONS BELOW: 
    (A) NIGHT BELL USlNG 8SLC CARD IN SLOT 02, CIRCUIT 3. 
    (B) MUSIC SOURCE FOR MUSIC-ON HOLD USING 4BWC CARD IN SLOT 18, CIRCUIT 2. 
    LAB MILESTONE: 
    8 VERIFY THAT NIGHT BELL AND MUSIC SOURCE ARE WIRED AND INSTALLED 
    CORRECTLY. 
    @ ASK INSTRUCTOR TO INSPECT CROSS CONNECTIONS AND INITIAL YOUR 
    PERFORMANCE CHECKLIST. 
    e TURN TO REVIEW EXERCISE 1.3 AND ANSWER OPTIONAL QUESTIONS 13 AND 14. 
    SUBMIT YOUR COMPLETED REVIEW EXERCISE TO THE INSTRUCTOR FOR GRADING. 
    @ YOU HAVE NOW COMPLETED THE OPTIONAL PERIPHERAL INSTALLATION LAB ACTIVITY. 
    1.77  
    						
    							Review Exercise (1.3) - Peripheral 
    I tisn 
    INSTRUCTIONS: THE FOLLOWING EXERClSE CONSISTS OF MULTIPLE CHOICE, FILL IN THE BLANK 
    OR MATCHING TYPE QUESTIONS. ALL AVAILABLE RESOURCES (I.E. STUDENT 
    WORKBOOK, NOTES, AND GTEP MANUAL) MAY BE USED AS REFERENCES. SUBMIT 
    EXERCISE TO INSTRUCTOR FOR GRADING WHEN LAST QUESTION HAS BEEN 
    COMPLETED. 
    1. WHAT CARD SLOTS AND CIRCUITS DO THESE SYSTEM CABLES SUPPORT (ALL SPACES WILL NOT 
    BE REQUIRED); 
    CABLE CARD SLOT / CIRCUITS CARD SLOT / CIRCUITS CARD SLOT / CIRCUITS 
    0 
    10 
    11 
    12 
    2. DESCRIBE THE FUNCTIONS OF CABLE NUMBER 12. 
    3. IF ALL CIRCUITS ON THE LINE AND TRUNK CARDS YOU INSTALLED WERE USED, HOW MANY 
    STATIONS AND TRUNK LINES COULD ACTUALLY BE INSTALLED? 
    STATIONS TRUNKS 
    1.78  
    						
    							ewiew 
    4. COMPLETE THE FOLLOWING DIAGRAM INDICATING THE CROSS CONNECTIONS THAT WERE 
    MADE FOR THE SIX EKT TELEPHONES. ONE OF THE CS-10 TELEPHONES HAS BEEN COMPLETED, 
    AS AN EXAMPLE. 
    cs-20 
    (CKT4) _ - 
    _ - 
    _ - 
    _ - 
    _ - 
    _ - 
    _ - 
    _ - 
    _ _ 
    _ - 
    _ - 
    _ - 
    _ - 
    _ - 
    _ - 
    _ - 
    _ - 
    _ - 
    ” - 
    _ - 
    _ - 
    _ - 
    _ - 
    _ - 
    _ _ 
    _ - 
    _ - 
    - - 
    _ - 
    _ - 
    _ - 
    _ - 
    - - 
    _ - 
    _ - 
    _ - 
    _ - 
    _ _ 
    _ - 
    _ - 
    _ - 
    CABLE 0. MODULAR 
    JACK 
    CABLE 1 
    cs-10 
    (CKTO)  
    						
    							eview Exercise (1.3) - Peripheral 
    ati 
    5. COMPLETE THE FOLLOWING DIAGRAM INDICATING THE CROSS CONNECTIONS THAT WERE 
    MADE FOR THE TWO SINGLE LINE TELEPHONES. 
    CABLE 1 - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    1.80 SLT 
    (CKTO) 
    I I 
    ET2 t 
    0 
    SLT 
    (CKT7)  
    						
    							ewiew Exercise 
    7. COMPLETE THE FOLLOWING DIAGRAM INDICATING THE CROSS CONNECTIONS THAT WERE 
    MADE FOR THE POWER FAILURE TRANSFER INSTALLATION (INCLUDE TRUNK AND 
    INSTRUMENT 
    CROSS CONNECTIONS, AS WELL AS CROSS CONNECTIONS TO THE THREE CARDS). 
    CABLE 1 
    (TO 8SLC) - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    - - 
    1.81  
    						
    All GTE manuals Comments (0)

    Related Manuals for GTE Omni Scbs Installation And Maintenance Manual